Skip to main content

MPOV-Wind family – Technical data

General

  MPOV-62 MPOV-32
GENERAL    
Year built 2015 nn
place built Germany Germany
flag German German
port of registry Kappeln Kappeln
callsign nn nn
IMO number nn nn
class GLDNV, + 100 A 5 "Offshore Support Vessel", + MC AUT, Environmental Passport, DP-2 GLDNV, + 100 A 5 "Offshore Support Vessel", + + MC AUT, Environmental Passport, DP-2
PRINCIPAL DIMENSIONS    
length over all 62,0 m 32,0 m
length b.p.p. 60,0 m 30,0 m
beam moulded 30,0 m 15,0 m
beam of hulls 7,5 m nn
depth 8,75 m nn
defign draft 5,0 m nn
gross tonnage ca. 3.200 GT nn
displacement ca. 2.650 t nn
MACHINERY & PROPULSION    
main propulsion 2x 2.000 kW azimuth hybrid drive thrusters nn
forward thrusters 2x 700 kW nn
generators 4x 600 kW (for 'hotel' and eco hybrid drive) nn
EDG 200 kW (also for 'cold ironing') nn
PERFORMANCE    
speed (full) 16 kn 16 – 25 kn
speed (eco) 9 kn nn
ACCOMMODATION, OFFICES, FACILITIES    
fixed total 23 single 23 single
fixed crew 11 single 11 single
fixed PAX 12 single 12 single
additional modular units +36 single nn
special additional modular units +>80 single nn
COMMUNICATION FACILITIES    
  smart selector for broadband data and voice satellite communication (GSM, GMDSS, A3) smart selector for broadband data and voice satellite communication (GSM, GMDSS, A3)
DYNAMIC POSITIONING    
DP-class DP-2 (full redundant) DP-2 (full redundant)
VRU 2 2
DGPS with RTK 2 2
hydro acoustic 1 USBL 1 USBL
laser 2 2
taut wire 1 1
gyro compass 3 3
environment 3 wind, 1 current 3 wind, 1 current
special modes access system, ROV, cable laying ROV
TANK CAPACITIES    
endurance 28 days @ 24/7 28 days @ 24/7
DECK AREA & SERVICES    
deck area ca. 1.300 m² ca. 400 m²
deck strength 5 t/m², 7 t/m²@ A-frame 5 t/m²
moon-pool 1 in hull, 1 in cargo deck 1 in hull, 1 in cargo deck
bulwark removable along working deck removable along working deck
container sockets densly distributed over cargo deck for high flexibility densly distributed over cargo deck for high flexibility
supply for modular units along cargo deck water, sewage and electrical supply along cargo deck water, sewage and electrical supply
CRANE, ACCESS-SYSTEM, HELI-DECK    
A-frame 15 t  
main crane designed for self loading in harbour conditions and for delivery of e.g. 6' containers onto WTG platforms in full compensation mode (heave and motion) nn
AUX-crane provision crane nn
access-system compensated access-system for direct access to WTG (w2w=walk to work) small access-system for direct acces to the boat landing of the WTG
heli-deck optional available but not recommended, pls. consult us for explanation of the reasons no
ROV    
survey ROV a survey ROV with 2 manipulators (small working ROV), several CCTV and a short range, high resolution SONAR is permanently available and can be deployed by the crew on short notice a survey ROV with 2 manipulators (small working ROV), several CCTV and a short range, high resolution SONAR is permanently available and can be deployed by the crew on short notice
crawler / dredger ROV a crawler / dredger ROV is available for e.g. cable laying operations and can be launched and recovered by the A-frame  
DAUGHTER CRAFTS    
category B nn
speed 25 kn+ nn
propulsion 2 water-jet for speed and perfect maneouverability nn
crew 1 for in field operations, 2 for CTV operations e.g. short notice crew-changes to port nn
PAX 12 nn